New nursery school "Gianni Rodari" in Ligugnana - San Vito al Tagliamento (PN)

Technical services: Structural proposal and execution plan


The building was erected and operative in only 127days. Nursery school is fully organized on single floor. The FFL quota is about 0.62m over ground level. The building mean height is about 4.50 meters. The project consisting of foundations slab defined by lattice joist with hollow flooring block infill. The main resisting structure is described by a timber "box system" and steel portal frame at school canteen area. The wood structures are made up by cross laminated panel defined as: 128mm thick (5 layer) for wall element; and 260mm thick (7 layers) for slab element. The gymnasium roof is a coffered wood ceiling with pyramidal skylight.